[CCoE Notice] FW: Cullen College ER D2

Perlowski, Ken krperlow at Central.UH.EDU
Wed Apr 13 07:25:34 CDT 2016


The faucet in the custodial closet broke this morning and partially flooded the first floor of Engineering 1, primarily near the closet. Some of the water got into the corridor walls and leaked into the adjacent rooms.  Maintenance repaired the faucet and with Custodial, mopped up the water.  For everyone who has a lab or office on the east side of the Engineering 2, near the elevators, please check for wet material on the floor.

Ken Perlowski
From: House, James F
Sent: Wednesday, April 13, 2016 2:46 AM
To: Alexander, Roderick; Rea, Jennifer D; Vargas, Jacquie; Villarreal, Carlos; Perlowski, Ken; Bangerter, Stephen A
Cc: Tisby, Carla
Subject: Cullen College ER D2

Custodial Roderick Alexander reported that a pipe was busted on the 1st floor in Cullen College ER D2 from janitorial closet. Dispatched Jerry Gowl Area 4 @ 2:06am and Ron Sampson plumber @ 2:16am to make repairs to issue reported at that building.

James House
Fix It Call Center Dispatcher
Facilities Services
University of Houston
4211 Elgin, Rm. 119A
Houston, TX 77204-1011
Email:jfhouse.central @uh.edu
Office: 713.743.4948
Fax: 713.743.5640

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20160413/f8cfa253/attachment.html 


More information about the Engi-Dist mailing list