[CCoE Notice] FW: !!REMINDER!! -- ELECTRICAL OUTAGE (AUGUST 1 AND 2, 2015) FOR MULTIPLE CAMPUS BUILDINGS
Perlowski, Ken
krperlow at Central.UH.EDU
Mon Jul 13 13:17:05 CDT 2015
This is a reminder that a power outage is scheduled for August 1 and 2 for a portion of campus. This will not affect any of the Engineering buildings.
There will be another power outage, probably over winter break, that will affect the Engineering buildings. This is the outage that was originally scheduled or last year, to do major repairs to the campus electrical system. I'm not sure of the length of time power will out be but there will be updates as the year progresses, with more detail. I will update as the information is available.
Ken Perlowski
From: Building Coordinator List [mailto:BUILDINGCOORDINATOR at LISTSERV.UH.EDU] On Behalf Of Vargas, Jacquie
Sent: Monday, July 13, 2015 11:46 AM
To: BUILDINGCOORDINATOR at LISTSERV.UH.EDU
Subject: !!REMINDER!! -- ELECTRICAL OUTAGE (AUGUST 1 AND 2, 2015) FOR MULTIPLE CAMPUS BUILDINGS
Importance: High
This is a follow up reminder of the upcoming August 1st and 2nd, 2015 electrical outage to occur between 7:00 am and 5:00 pm both days. Only the 18 buildings listed in the outage notification will be impacted by this outage.
All normal electricity will be off to the buildings. Only emergency generator life safety systems will be in operation for the duration of the outage. Note: All outage types checked in the notification will be shut down during the outage. Buildings will be locked - building occupants should not be inside the buildings during the outage. Generators for each of the 18 buildings listed will run for duration of the outage (for approx. 10 hour period each day). Please make sure all building users / occupants have been notified. Feel free to distribute the notification form.
To view and print the complete outage notification which contains further information and details, go to https://drive.google.com/file/d/0BzZIxIwNRGCyWHFSR3pieGljN0E/edit?pli=1.
Thank you, Facilities Communications
[cid:image003.jpg at 01D0BD6E.36EF0270]
Jacquie Vargas
832-842-4861
From: Vargas, Jacquie On Behalf Of Facilities Operations Communications
Sent: Friday, June 12, 2015 1:14 PM
To: dutyroster at listserv.uh.edu<mailto:dutyroster at listserv.uh.edu>; 'buildingcoordinator at listserv.uh.edu'; 'CSC (csc at Central.UH.EDU<mailto:csc at Central.UH.EDU>)'; GEN-PARTNERS at LISTSERV.UH.EDU<mailto:GEN-PARTNERS at LISTSERV.UH.EDU>; 'outagenotifications at listserv.uh.edu'; 'FAC-PLN-CONSTR-STAFF at listserv.uh.edu'; 'FAC-MGT-STAFF at listserv.uh.edu'
Subject: Electrical Outage (August 1 and 2) for Multiple Campus Buildings - Open for List
For distribution and communication -
A planned electrical outage is scheduled for August 1st and 2nd to investigate recurring sub-feeder failures and make necessary repairs. All normal electrical power will be shut down each day at 7:00am and turned back on at 5:00pm. Only the buildings listed below will be impacted.
To view and print the complete outage notification which contains further information and details, go to https://drive.google.com/file/d/0BzZIxIwNRGCyWHFSR3pieGljN0E/edit?pli=1.
Buildings Affected
501
Roy Cullen
557
Bates Residence Hall
516
E. Cullen
558
Taub Residence Hall
517
Cullen Performance Hall
559
Oberholtzer Residence Hall
524
Student Service Ctr. I
562
Bruce Religion Ctr.
526
Student Service Ctr. II
563
Cougar Village I Residence Hall
525
UH Health Center
568
Center for Students with Disabilities
534
Heyne Bldg.
586
Cameron Bldg.
555
Law Residence Hall
587
Farish Hall
556
Settegast Residence Hall
588
McElhinney
To view the Outage Notification calendar maintained by Facilities Operations, please go to http://uh.edu/plantops/services/planned-outage/index.php.
Thank you.
Facilities Services Communications
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20150713/bd7a4e9d/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: oledata.mso
Type: application/octet-stream
Size: 97351 bytes
Desc: oledata.mso
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20150713/bd7a4e9d/attachment-0001.obj
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 159227 bytes
Desc: image003.jpg
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20150713/bd7a4e9d/attachment-0001.jpg
More information about the Engi-Dist
mailing list