[CCoE Notice] FW: Winter 2014 Outage Update

Perlowski, Ken krperlow at Central.UH.EDU
Thu Nov 13 16:31:54 CST 2014


After a couple of e-mails back and forth, what will happen is that on 12/26, between 5:30 AM and 6:30 AM, there will be several power blips in Engineering 1 and 2, as the generators are tested and the building goes onto generator backup.  On 12/30, between 5:30 PM and 6:30 PM, there will be power blip as the buildings go from the generator to normal power. Both buildings will run on backup generator power between 12/26 and 12/30.

Please power down everything that does not turn back on or will be damaged by a sudden power loss during these times. Normal operations should be able to continue on backup power and after return to normal power on 12/30.

Please call or e-mail if you have any questions.

Ken Perlowski

From: engi-dist-bounces at EGR.UH.edu [mailto:engi-dist-bounces at EGR.UH.edu] On Behalf Of Perlowski, Ken
Sent: Thursday, November 13, 2014 1:19 PM
To: Engineering Distribution List (engi-dist at egr.uh.edu)
Subject: [CCoE Notice] FW: Winter 2014 Outage Update

Winter 2014 Outage Update

Ken Perlowski

From: Building Coordinator List [mailto:BUILDINGCOORDINATOR at LISTSERV.UH.EDU] On Behalf Of Vargas, Jacquie
Sent: Thursday, November 13, 2014 1:16 PM
To: BUILDINGCOORDINATOR at LISTSERV.UH.EDU<mailto:BUILDINGCOORDINATOR at LISTSERV.UH.EDU>
Subject: Winter 2014 Outage Update

For distribution and communication -

In order to provide consistent and reliable electrical service on campus and to avoid future failures of the campus electrical system, pre-investigative and repair maintenance efforts are needed.

Please be advised that the University's plan to perform a complete campus electrical shut-down has been cancelled during the winter break 2014 until further notice.

As a result, brief electrical disruptions will take place over the winter break. These are scheduled to occur between Dec. 26 and Dec. 30.

Building backup generators will be online during the electrical blips, which will occur as systems are transferred to generator power.  Once the work is completed, blips will occur as the campus electrical feeders are realigned and balanced.  Impacts will be to intermediate distribution frame (IDF) equipment, computers, lab research equipment and any instrument that is not on an uninterrupted power supply (UPS).

Please make all necessary arrangements to protect equipment during these power disruptions.

The intent is not to disrupt research or teaching efforts. However, if any department determines that the scheduled power blips will be problematic and unacceptable, they should reach out so that efforts can be made to accommodate their needs.

Principal Project Manager Shannon Jones is leading the electrical outage and can be contacted at 713-743-4469 or sejones3 at Central.UH.EDU<mailto:sejones3 at Central.UH.EDU>. If additional support is required as far as any experiments or ongoing research, contact Facilities Management Executive Director Herman Taitt at 713-743-6563 or taitt at uh.edu<mailto:taitt at uh.edu>.

For assistance during the electrical disruptions, contact the Facilities Service Center at 713-743-4948 or csc at central.uh.edu<mailto:csc at central.uh.edu>.

For a list of buildings impacted by the electrical disruptions, or power blips, refer to the list provided below.

Buildings Impacted by the Pre-Investigative and Maintenance Related Power Blips -

Bldg.#

Building Name

Friday, 12/26/14
5:30 am - 6:30 am

Tuesday, 12/30/14
5:30 pm - 6:30 pm





(3 -- 10 second 1)

(2 - 3 second 2)

(2 - 3 second 3)

106

TLCC

X





498

Bulk Fueling Diesel Tank Farm



X

X

499

CBB

X





501

Roy Cullen

X





502

Science Building 1



X

X

503

Tech I Annex

X





505

Optometry

X

X



505

Optometry,  Animal Care

X



X

507

Wortham Theater

X





508

Tech II

X





509

MDA Library

X





510

Cougar Place Res.

X





515

Central Plant

X





516

E. Cullen

X





518

Calhoun Lofts

X

X

X

   520

Moore's School of Music

X

X

X

522

CRWC

X

X

X

523

Science Engineering Annex



X

X

524

Student Service Ctr. I

X





527

EHRM 1



X

X

528

Melcher Hall

X





531

Hofheinz Pavilion

X





534

Heyne Bldg.

X





535

EHRM 2



X

X

536

Center for Public Broadcasting



X

X

537

Bates Law

X





539

Krost Hall

X





543

Architecture Building

X





544

Cemo Hall

X





545

SERC

X





547

PGH

X





549

Social Work

X





550

SR1

X

X

X

551

SR2

X

X

X

559

Oberholtzer Residence Hall

X





563

Cougar Village 1

X





564

Lamar Fleming

X

X

X

565

University Center North

X





567

University Center Satellite

X

X

X

572

General Services Storage Bldg



X

X

574

Alumni Center

X





576

Science Teaching Lab

X

X

X

578

Agnes Arnold Hall

X





579

Engineering 1

X

X

X

580

Engineering Lecture Hall



X

X

581

Engineering 2

X

X

X

584

Moody Towers & Kitchen

X

X

X

585

General Service Bldg.

X

X

X

586

Cameron Bldg.

X





587

Farish Hall

X





589

Fine Arts

X





590

Hilton Hotel North

X





590

Hilton Hotel South

X

X

X

593

Houston Science Ctr.

X

X

X

594

Engineering Resource Ctr.



X

X

596

Computing Center

X

X

X

598

Clinical Research Services

X






1 Buildings that will see 3-10 second power blip for emergency generator testing. All of the listed buildings generators will run for a 12 - 48 hour period.
2 Buildings that will see multiple 2-3 second power blips on the entire normal power to the facility while Cougar 1 is isolated.
3 Buildings that will see multiple 2-3 second power blips on the entire normal power to the facility while Cougar 1 is put back into service and campus electrical feeder are realigned for load balancing.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20141113/5f5836bd/attachment-0001.html 
-------------- next part --------------
An embedded and charset-unspecified text was scrubbed...
Name: ATT00001..txt
Url: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20141113/5f5836bd/attachment-0001.txt 


More information about the Engi-Dist mailing list