Due to the paint odors being generated in the Basement floor of Engineering 1, it has been suggested that the painting be performed over Spring Break. Is this acceptable? Ken Perlowski -------------- next part -------------- An HTML attachment was scrubbed... URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20140207/e229b98c/attachment.html