[CCoE Notice] D3 Repairs

Lewis, Lindsay R lrlewis2 at Central.UH.EDU
Mon Feb 7 11:28:05 CST 2011


Cullen College of Engineering Bldg. D3

Beginning this week the UH Projects team will start the repairs to the Cullen Engineering Building D3 facility.  This is necessary to repair the exterior façade of the building.  The windows have leaked for a number of years and this repair and resealing project will correct that.

The Exterior walls shall be cleaned around the perimeter to allow for the repairs to occur.  There will be some adjustments, trimming, and removal to the landscaping and the placement of the trees as well.  Each of our entrances will be closed intermittently during the project.  Scaffolding will be placed around our building also and it will be noisy.

This project should be complete by the end of March.  Please be patient and assist when possible to bring this project to a successful closure.

====================================================
Dorothy M. Barrera
Cullen College of Engineering
Director, College Business Operations
University of Houston
713.743.4206    Voice
713.743.4213    Fax
E-Mail:  Dbarrera at uh.edu
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20110207/faaf1666/attachment.html 


More information about the Engi-Dist mailing list