<html><head></head><body bgcolor="#FFFFFF"><div><br><br></div><blockquote type="cite"><div><br></div></blockquote><div><span></span></div><blockquote type="cite"><div>CCE Faculty and Staff:<br><br>The Y building demolition is underway. The attached file indicates where fencing will be put in place on Tuesday, 6/26. Those that have reserved parking next to the Y building will be officially notified by UH parking very soon. Expect to be told that "reserved" spaces will be carved out for you in Lot 19D beginning Tuesday, June 26. Thus, the "unreserved" spaces in Lot 19D will be reduced accordingly.<br>
<br>The demolition schedule will run 40-50 days with a largely silent phase that<br>includes extermination and abatement. We expect that by the day of the "Y Goodbye Celebration" on 7/19 that the peeling of the Y Building metal "skin" will be underway.<br>
<br>Thanks for your attention to this matter.<br><br>fc<br><br> <br> <br>Fritz Claydon Ph.D.<br>Professor of Electrical and Computer Engineering<br>Associate Dean of Administration and Research<br>University of Houston<br>
Cullen College of Engineering<br>713.743.4204<br><a href="mailto:fclaydon@uh.edu" target="_blank">fclaydon@uh.edu</a><br><br><p>
<img alt="Carnegie Designation Tagline Logotype - UH Logotype only" src="http://www.uh.edu/policies/graphicstandards/graphic/T1%20Signature.JPG" height="103" width="210">
</p><br><p><span style="font-size:11pt;color:rgb(95,73,122)"></span><span style="font-size:9pt;font-family:"Lucida Calligraphy";color:rgb(95,73,122)"></span></p>
<p><span style="font-size:11pt;color:rgb(95,73,122)"></span><span style="font-size:9pt;font-family:"Lucida Calligraphy";color:rgb(95,73,122)"></span></p>
<p><b> </b><b><span style="font-size:10pt;color:rgb(31,73,125)"></span></b></p><br>
</div><div></div></blockquote></body></html>