[CCoE Notice] FW: Scheduled Electric Outage for IDF closets

Luong, Kiet A KDLuong at Central.UH.EDU
Thu Apr 12 15:13:36 CDT 2018


Goof afternoon,

I confirmed that there will be power outage in building 581 (Engineering Building 2) Friday morning (4/13/18) from 5AM until possibly 8AM, on floors 2-4.  If you have computers in this building on 2nd-4th floors, please shut them down before leaving today to avoid potential computer hardware problems.  Please let me know if you have any problems shutting down your computers.

Thanks,

Kiet Luong
Director of Engineering Computing
College Information Security Officer
Cullen College of Engineering
University of Houston
Email: KietL at uh.edu<mailto:KietL at uh.edu>
Voice: 713.743.9974

From: Chance, Ron
Sent: Wednesday, April 11, 2018 3:16 PM
To: Luong, Kiet A <KDLuong at Central.UH.EDU>; Schexneider, James <jschexne at Central.UH.EDU>
Cc: Mays, Leroy <lmays at Central.UH.EDU>
Subject: Scheduled Electric Outage for IDF closets
Importance: High

UH Electrical technicians need to perform maintenance on the IDF closets on the 2, 3, 4 floors of building 581.  The tentative schedule is 5am Friday, 13APR18.  They estimate that the power will be interrupted for only a couple of hours at the most.

Ron Chance
Manager, Information Technology Availability Center
832-842-4689 | rkchance at uh.edu<mailto:rkchance at uh.edu> | www.uh.edu/itac<http://www.uh.edu/itac>
[cid:image001.png at 01D3D1A7.0FADAC20]

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20180412/5db677a4/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 12649 bytes
Desc: image001.png
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20180412/5db677a4/attachment-0001.png 


More information about the Engi-Dist mailing list