[CCoE Notice] FW: B825, ECFP - Fire Pump: Electrical Outage Request for 01/28/2017

Perlowski, Ken krperlow at Central.UH.EDU
Wed Jan 11 11:29:09 CST 2017


Please see the attached outage notification that will affect Engineering 1 and 2, and the Engineering Lecture Hall. There will be a 1-5 minute outage while the subfeeder is switched to it's normal position.  The work on the fire pump project will not affect the engineering buildings until it is finished and then Facilities will make the switch.

All equipment on backup power should start back up when power is restored. Users should check to make sure everything comes back up, if not, please call FixIt and report.  Please turn off equipment and computers prior to the outage.

Ken Perlowski

From: Simmons, Barry E
Sent: Wednesday, January 11, 2017 8:34 AM
To: Facilities Communications
Cc: Keilbach, Karl; Whitfield, Craig; Wheeler, Mike; dpursley at d1construction.com; Regan, Jim; Perlowski, Ken; Wysong, Mackenzie; Norcom III, James G; Veteto, Alyssa M; Bell, Douglas; McGhee, Fred; Mahanay, Mike
Subject: B825, ECFP - Fire Pump: Electrical Outage Request for 01/28/2017

Jennifer/Jacquie:

Please find attached an outage request for an electrical outage that affects a number of buildings on campus.

This electrical outage is required in order to replace the existing 300KVA transformer with a 500KVA transformer at the Engineering Complex Fire Pump, Building 825, and repair an Sub-Feeder 4 electric box in the utility tunnel, Building 541 .

The outage request is for Saturday, January 28, 2017, beginning at 7:00AM and ending Sunday, January 29, 2017, at 5:30PM.

Impact(s) to the building are shown on the attached Table to the Outage Request.

I have copied the building's Building Coordinators on this request to give them a heads-ups on the request and impact to their building or project.

To mitigate the effects of the electrical outage, there will be support from the various Facility Services Shop to address issues.

Please let me know if you have any questions.

Thanks.

Barry

Sincerely,
Barry E. Simmons, PE, PMP, FMP, SFP
Sr. Project Manager
Facilities Planning and Construction
University of Houston
A Carnegie-designated Tier One public research university
713-743-9073 (Office)
832-491-6059 (Mobile)
besimmon at central.uh.edu<mailto:besimmon at central.uh.edu>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20170111/047a0a5f/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: PLANNED OUTAGE NOTIFICATION 11-15-2016_R1.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 58428 bytes
Desc: PLANNED OUTAGE NOTIFICATION 11-15-2016_R1.docx
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20170111/047a0a5f/attachment-0001.bin 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Copy of Enginerring FPC Outage Impact 1-28 to 1-29-2017.pdf
Type: application/pdf
Size: 88806 bytes
Desc: Copy of Enginerring FPC Outage Impact 1-28 to
	1-29-2017.pdf
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20170111/047a0a5f/attachment-0001.pdf 


More information about the Engi-Dist mailing list