[CCoE Notice] Fire Pump Construction

Perlowski, Ken krperlow at Central.UH.EDU
Mon Jan 4 13:52:30 CST 2016


Installation of the new fire pump fire line has started.  Work is concentrated in the basement corridors of Engineering 1 and the second floor corridor of Engineering 2 and the bridge to Engineering 1.  The contractor is making every attempt to keep a clean work place, control dust and stay out of everyone's way.

I will be forwarding graphics showing the work areas and times as soon as they become available.

Please call if there are any problems.

Ken Perlowski
714-743-559o
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20160104/5e1f1854/attachment.html 


More information about the Engi-Dist mailing list