[CCoE Notice] FW: SIDEWALK CLOSURE NEAR MREB OUTAGE NOTIFICATION (08 DEC 2015)

Perlowski, Ken krperlow at Central.UH.EDU
Mon Dec 7 07:39:13 CST 2015


Please see the attached sidewalk notification.  The engineering Fire Pump project is mobilizing and they will be closing off on several sidewalks in the immediate construction area.  Access will still be available to the Engineering Lecture Hall and Engineering 1.

Ken Perlowski

From: Building Coordinator List [mailto:BUILDINGCOORDINATOR at LISTSERV.UH.EDU] On Behalf Of Facilities Communications
Sent: Friday, December 04, 2015 5:38 PM
To: BUILDINGCOORDINATOR at LISTSERV.UH.EDU
Subject: SIDEWALK CLOSURE NEAR MREB OUTAGE NOTIFICATION (08 DEC 2015)

For distribution and communication -

Please view the following outage scheduled for Tuesday, December 8, 2015 on the Outage Notification Calendar<http://www.uh.edu/plantops/services/outage/index.php> maintained by Facilities Services or see the attached outage with included diagram.

SIDEWALK CLOSURE OUTAGE NOTIFICATION
Outage Impact: The west sidewalk and the diagonal sloped sidewalk will be closed, however, the east sidewalk adjacent to MREB and the accessible ramp leading to the Engineering Lecture Hall will be open and available for the duration of the project.  Please refer to the diagram of the construction site.


Thank you,
Facilities Communications
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20151207/5414e002/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: PLANNED SIDEWALK CLOSURE NEAR	MREB WITH DIAGRAM (8 DEC 2015 THRU JULY 2016).pdf
Type: application/pdf
Size: 336315 bytes
Desc: PLANNED SIDEWALK CLOSURE NEAR MREB WITH DIAGRAM (8 DEC
	2015 THRU JULY 2016).pdf
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20151207/5414e002/attachment-0001.pdf 


More information about the Engi-Dist mailing list