[CCoE Notice] FW: SUB FEEDER 1 REPAIR -- PLANNED ELECTRICAL OUTAGE NOTIFICATION (DEC 28 THRU DEC 30 2015)

Perlowski, Ken krperlow at Central.UH.EDU
Fri Dec 4 14:52:43 CST 2015


Please the attached notification and  information.

Ken Perlowski

From: Building Coordinator List [mailto:BUILDINGCOORDINATOR at LISTSERV.UH.EDU] On Behalf Of Facilities Communications
Sent: Friday, December 04, 2015 1:56 PM
To: BUILDINGCOORDINATOR at LISTSERV.UH.EDU
Subject: SUB FEEDER 1 REPAIR -- PLANNED ELECTRICAL OUTAGE NOTIFICATION (DEC 28 THRU DEC 30 2015)

For distribution and communication -

Please view the following outage scheduled for Monday, December 28, 2015 through Wednesday, December 30, 2015 on the Outage Notification Calendar<http://www.uh.edu/plantops/services/outage/index.php> maintained by Facilities Services or see the attached outage notification.

Sub Feeder 1 Repair -- PLANNED ELECTRICAL OUTAGE NOTIFICATION

Outage Impact: IMPORTANT NOTE:  Buildings shall not be occupied while the outage is in effect.  All normal electrical power will be out for the duration of the outage. All systems that require normal building power will be non-functional. Only equipment that is tied to the emergency generator system will be functional during the outage period - i.e. emergency lighting, fire alarms systems, limited elevators, or departmental equipment that is known to be tied to generator circuits. Please make all necessary arrangements to protect interdepartmental equipment (computing, research, office, etc.). After the outage, facilities technicians will verify that the main building systems are operational - operation of interdepartmental equipment will need to be verified by the building occupants and users. Report any related facilities issues to the FIX-IT Customer Service Center.



Thank you,
Facilities Communications
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20151204/31231638/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: PLANNED ELECTRICAL OUTAGE	NOTIFICATION - SUB FEEDER 1 WITH LIST (12-28 THRU 12-30).pdf
Type: application/pdf
Size: 131441 bytes
Desc: PLANNED ELECTRICAL OUTAGE NOTIFICATION - SUB FEEDER 1
	WITH LIST (12-28 THRU 12-30).pdf
Url : http://Bug.EGR.UH.EDU/pipermail/engi-dist/attachments/20151204/31231638/attachment-0001.pdf 


More information about the Engi-Dist mailing list