Dear Cullen College Community:

The fans on the first floor of engineering building 2 will need to stay a bit longer in order to dry the walls. Facilities Management will be conducting a moisture test late this afternoon to determine whether the fans can be removed. We hope that the fans will be removed by tomorrow, but will send along another update if that is not the case.

Thank you all for your patience as we address this issue.


-----Original Message-----
From: engi-dist-bounces at EGR.UH.edu [mailto:engi-dist-bounces at EGR.UH.edu] On Behalf Of Grayson, Audrey A
Sent: Tuesday, December 10, 2013 4:40 PM
To: engineering-student at listserv.uh.edu; engi-dist at egr.uh.edu
Subject: [CCoE Notice] Fans in engineering buildings

Dear Cullen College Community:

This message is to inform you that fans will be located throughout our buildings to help dry out a water leak that occurred last night. 

The fans are located in the Civil Engineering labs and classrooms in the east wing of the first floor of Engineering 2 because of drain backup that caused water to leak onto the floors last night. The fans need to run overnight and they will be taken away in the morning.  

Thank you.
_______________________________________________
Engi-Dist mailing list
engi-dist at EGR.UH.EDU
Cullen College of Engineering
University of Houston



More information about the Engi-Dist mailing list